City Scape

3.11 Asset Decommissioning / Disposal

  • Ecological Transformation and the Circular Economy

    BoK Content Type: 
    Video
    BoK Content Source: 
    MainTrain 2023
    Original date: 
    Tuesday, September 12, 2023
    The case for action on climate change has been accepted by the world, and it is time for commercial and industrial leaders to take action. In Veolia we call this ECOLOGICAL TRANSFORMATION. It represents a proactive and in-depth change in our methods of production and consumption in order to provide the solutions our societies need. In Short, Ecological Transformation means walking the talk and taking real action to achieve society's goals for Climate Action. I will talk about the need to make our economy more "Circular", what that means and ask if we, as Asset Management Professionals, are prepared. Finally I will use a case study of Electric Vehicle Battery management to illustrate the concepts that I hope you will find interesting.
  • The Decommission Boom - A Path to Carbon Neutrality

    BoK Content Type: 
    Presentation Slides
    Video
    Presentation Paper
    BoK Content Source: 
    MainTrain 2023
    Original date: 
    Wednesday, September 13, 2023
    Asset decommissioning is a large and fast-growing business. However the full comprehension of the program terms for both cost and the complexity of this execution phase in an assets lifecycle is regularly misunderstood. This presentation will discuss the ways to find the right model for asset decommissioning. As the world moves quickly on the path to carbon neutrality, replacing our aging assets with a clean-energy option is a critical step towards the reduction of large (GHG) greenhouse gas producing assets. As a part of our enterprise mission throughout the world in all industrial sectors, the immediate "turn on the switch" to carbon neutral will be met with increasing challenges of supply and demand and our new race to the green planet. Now, seen as a corporate responsibility rather than a burden, our mission bears greater challenges than just reducing carbon, and poses another layer of complexity when deciding what, when and how to decommission while balancing significant capital investments to remain sustainable. If our current practices for our assets life-cycle; from design through to operational phase are without standardization, we then introduce greater technical challenges, economic cost and psycho-social challenges that affect our workforce retention during the end of the assets life. While we collectively align to combat our climate crisis, we also enter deeper into a "Throwaway" Society. World-wide decommissioning has become a "hot topic" as we see many assets reaching their end of life, while at the same time climate change takes center stage. As the increased public eye adds another layer of scrutiny over asset decommissioning, we need to create an efficient and effective program that will accept "green" decommissioning, supporting a circular economy through recycling and waste reduction, while looking towards ways to reuse existing assets for renewable energy transformation.
  • Humans...Assets?

    BoK Content Type: 
    Presentation Slides
    Video
    BoK Content Source: 
    MainTrain 2022
    Original date: 
    Tuesday, May 3, 2022
    Recently there was a lot of discussion on various forums around the term ‘Human Asset’. It was prompted by a paper/presentation made by Dr. Monique Beedles in Australia where she questioned the term and the appropriateness of using it based on the definition of an asset in ISO 55000 – ‘an item, thing, or entity that has value or potential value to the organisation (ISO, 2014)’.There were questions posed on the various forums as to the use of ‘thing’ to describe humans – it’s legal meaning, it’s cultural implications and though most posting felt the term was appropriate, there was definitely a difference of opinion. What wasn’t brought out in most of the discussions was the intent or suitability of the decision to word the definition that way. No-one disagreed with the idea that a human ‘has value or potential value to the organization’ and so rather than argue about the term, I’d like to explore how we could apply the tools and lifecycle approach we use for physical assets, to humans. Let’s walk through the lifecycles and see if we can find how it might apply to humans.Concept Design Acquire Operations and Maintenance Decommission So as I said I won’t address the term ‘human asset’ but hopefully you can see that taking the same approach to ensure that the ‘value or potential value to the organization’ is certainly a good alternative.
  • Operational Readiness (OR) Global Approach to Asset Management Landscape & Best Practices

    BoK Content Type: 
    Presentation Slides
    Video
    Presentation Paper
    BoK Content Source: 
    MainTrain 2022
    Original date: 
    Monday, April 4, 2022
    Within our toolbox of best practices, the concept of Operational Readiness (OR) has been discussed, strategized, budgeted, and engaged, to prepare the asset(s) in transition from OEM to start-up, whether for the construction of a single asset such as a mine haul truck, or unique piece of manufacturing equipment, or for multiple assets within an infrastructure such as a hospital, or rail transit line to create the smoothest, "turn key" process for the newly acquired asset, prior to deployment into operations.Through the many global industries, we have been blessed with a very holistic view of what Operational Readiness should look like. However, the process can be seen as a high level strategy, which fails to incorporate the depth and breadth required to ensure all steps of the plan will engage tactics which align with corporate vision and mission, supporting critical aspects of readiness; the tracking platform, communications, and follow up methods used to ensure we engage stakeholders as "partners" in our journey, rather than captives in a process to ensure the asset is truly "Operationally Ready", before we sign off with the asset owners.As a result, tactics used are many time absence of an accurate tracking process to ensure the highest level of QA/QC. What better time to achieve this accuracy then at the inception of the new asset, just like we do when we welcome a new baby into our family. But can we honestly say we plan everything for our new addition? Definitely not.  We can agree, that we are not all aligned in how or what we will feed our child when they turn 2 years old, rather we commit to the short term plan and move forward.Why? Simply put, it takes a lot of effort to "sweat the small stuff", however the tactics used for Operational Readiness, it is critical we "sweat the small stuff" as we build a platform that will support the process, while focusing on reduction of the 7 + 1 types of waste, and by making the process simple and attractive to the ones responsible for getting the process steps completed in our journey.An OR report study from Deloitte (2012) revealed that if a company can achieve OR process effectively, they would have an opportunity to reduce the risk of loosing 30% of their capital value. In addition, the severe detrimental impact on Capex and initial operational capacity, ongoing operations and maintenance costs over an asset’s lifecycle are typically 1 – 2% higher, year-on-year and for the entire life of the asset, where operational readiness was not sufficiently achieved at the outset.  And then there is value add for safety and employee morale.Everyone’s best intentions are traditionally met with the reality of how many small, yet critical alignment steps there are to truly set up the asset to be resilient and sustainable within the lifecycle and within the desired Asset Management Landscape within your organization.Chaos usually rears its ugly head at a period after the asset has been commissioned and signed off with the asset owner. Normally the front end of design for reliability, need vs. want, master maintenance plans, parts and operations, maintenance and training strategies are set well.  However, are they truly measured by the organization, in a way that supports the quality of work to manage QA/QC performance and excellence of each process step?  Many stakeholders will have touch points in the process; either one time, or many times well past the commissioning stage, right to the end of asset life; retire, restore or renewal process, which is all part of the OR.  In this presentation for the Operational Readiness (OR) Global Approach to Asset Management Landscape & Best Practices, the information will address how Agnico Eagle Mining Ltd., has taken the opportunity within the Nunavut Division,  Asset Management group to enhance the tracking performance and following up with every stakeholder to ensure the actual work is being performed, at the right time, for the right reasons and the completion of each of the hundreds of secondary and tertiary steps are properly aligning with the timing to bring the asset into operational state.The presentation will discuss the practice and "out of the box" applications readily available using the Microsoft 365 suite of programs, such as SharePoint and the supporting applications available, without engaging in complex processes, spreadsheets or software tracking, workflow, and communication platforms.  It is challenging to keep everything tracked and packaged in one system available to everyone when having to apply multiple CMMS, EAM, ERP, or other 3rd party application systems help to support the management of assets. 
  • The Economics of Bad Parts

    BoK Content Type: 
    Article / Newsletter
    BoK Content Source: 
    Practitioner Produced
    Original date: 
    Monday, June 15, 2020
    This article will be discussing the issues and some causes of bad parts.
  • MRO Stores Support of Maintenance

    BoK Content Type: 
    Article / Newsletter
    BoK Content Source: 
    Practitioner Produced
    Original date: 
    Thursday, April 2, 2020
    How well is your MRO Stores system integrated with your maintenance requirements to ensure effective support of your organization’s maintenance efforts?Most of MRO stores efforts are to provide parts and materials to both Operations and Maintenance. For this article, the focus will be upon MRO stores support of Maintenance.