City Scape

1.1 Requirements & Expectations

  • Aperçu de la gestion de l’actif véhiculaire - 26 mars 2019

    BoK Content Type: 
    Presentation Slides
    Webcast
    BoK Content Source: 
    Practitioner Produced
    Original date: 
    Tuesday, March 26, 2019
    -Introduction a la gestion d’actifs véhiculaires-Processus intégré de la gestion d’un parc d’actifs véhiculaires-L’analyse du cycle de vie financier-Performance de l’actif-Questions et conclusions 
  • Demystifying Your R&M Pathway to Operational Success

    BoK Content Type: 
    Presentation Slides
    Presentation Paper
    BoK Content Source: 
    MainTrain 2019
    Original date: 
    Friday, March 22, 2019
    Metrics, best practices, more than 40 key elements to implement, challenges, and opportunities all combine to make a successful implementation difficult. Where do you start, and how do you know how to work on what matters? Once you understand how it’s all related, you can focus on the vital few to leverage the maximum ROI. This presentation will clarify the importance of culture and employee engagement, along with other key plant floor performance indicators that will be clarified with data. We'll look at the current state of R&M; what’s working and what's not; survival skills for the next decade; impacts of connected technologies (edge computing, big data, machine learning, AI, 3D printing, augmented reality); the importance of getting your data ready for what's coming next; and relationships between R&M and safety, people engagement, quality, throughput/uptime, and cost.
  • Root Cause Analysis: Driving Bottom Line Improvement by Preventing One Failure at a Time

    BoK Content Type: 
    Presentation Slides
    Webcast
    BoK Content Source: 
    Practitioner Produced
    Original date: 
    Thursday, February 28, 2019
    Many maintenance and reliability staff are so busy fixing problems that they never get the chance to prevent them. In a reactive work environment, there is simply no time to spare. Root cause analysis (RCA) gives us an easy-to-implement approach to preventing failures that integrate with our current troubleshooting efforts and drives bottom-line business improvement. We can make our workplaces safer by reducing the number of unexpected failures, which will then result in improving our business performance, increasing our facility’s throughput and reducing the money spent on repairs – straight to the bottom line.
  • Establishing a Governance Model to support AM Development

    BoK Content Type: 
    Presentation Slides
    Webcast
    Presentation Paper
    BoK Content Source: 
    Practitioner Produced
    Original date: 
    Thursday, December 13, 2018
    The structural configuration of an organizational design is the way work is divided and how it achieves co-ordination among its various work activities around the assets’ lifecycles. An organizational design structure resolves two basic tasks to get work done: dividing up the work into logical units, which enables performance management, and ensuring the work gets done by providing the co-ordination and control of work. In this webcast we’ll look at four models and discuss their advantages and disadvantages and present suitable information on typical roles and responsibilities that will be reflective of the selected model. The goal of asset management (AM) is to ensure that an organization’s staff is always working on the right activities at the right time, for the right reason, and for right cost. The AM governance model is intended to ensure there is effective collaboration and co-ordination to make this happen around all business processes. With the right AM governance model, overall AM program development can be expedited and new ways of working can be quickly integrated into the organization’s AM culture. We’ll provide the actual results from a number of case studies to demonstrate the value of designing and implementing the most appropriate AM governance model for your organization.
  • Outsourcing a Part of Physical Asset Management – How to Decide

    BoK Content Type: 
    Presentation Slides
    Webcast
    BoK Content Source: 
    Practitioner Produced
    Original date: 
    Thursday, December 13, 2018
    Asset-intensive industries have changed radically because of regulatory and technological changes. This has allowed many new investors to enter existing markets and forced established companies to consider new markets for growth. Simultaneously, new technology has levelled the playing field as high efficiency changes economies of scale and market dynamics. To manage their risks and uncertainties associated with new technology, while still focusing on improving profits, many asset owners look to outsourcing part of the physical asset management responsibility to specialized operations and maintenance companies. The owners gain advantages through the transfer of non-core activities to the supplier to reduce costs or to reduce risk. Whatever the rationale for outsourcing, the owner requires a method to evaluate outsourcing options to determine which is right for it, given its own internal capacity and strategy. The decision process must be capable of selecting the right type of service level based on a number of tangible and intangible strategic criteria. This type of multi-faceted decision necessitates process based on a sound theoretical foundation that can compare different options against the critical criteria of lifecycle costs, revenue influences, quality, health and safety, and other key drivers. In this workshop, we’ll look at a case study model using the analytical hierarchy process (AHP) as a tool capable of evaluating this type of diverse multi-levelled decision. AHP is simple and straightforward, and uses an easy-to-understand hierarchical structure to sort criteria based on their relative importance.  
  • The Storeroom Layout: Setting Up Yourself For Success

    BoK Content Type: 
    Article / Newsletter
    BoK Content Source: 
    Practitioner Produced
    Original date: 
    Wednesday, May 9, 2018
    Setting up or organizing a storeroom is a major undertaking, but it has the ability to dramatically impact the ability of the storeroom to deliver its function.   Sadly, many storerooms are not organized properly and are forced into specific accommodations.   But armed with some basic information, you will be able to setup a proper storeroom.
  • Gas Plant Maintenance Structure Work Leadership

    BoK Content Type: 
    Webcast
    BoK Content Source: 
    Practitioner Produced
    Original date: 
    Friday, April 6, 2018
    Ross Markowski was part of the final phases of construction of a gas plant that was experiencing a change of ownership. Ross used the Capstone Project and the myriad changes happening at his site as an opportunity to think through the possibilities of a new organizational design and leadership model to achieve site-wide engagement in proactive maintenance for the upcoming commissioning and operation of the plant. Ross’s presentation summarizes the pros and cons of the existing and proposed organizational structures and touches on some of the challenges of implementation.Whether you are in oil/gas, manufacturing, forestry or another industry, you will find the lessons learned through Ross Markowski’s Capstone Project applicable to most situations where changes are occurring, work still needs to planned and executed and people are your most important resource in getting the work done.
  • ‘Pumping’ Technology into our ‘Sewage Pumping Stations’

    BoK Content Type: 
    Presentation Slides
    Presentation Paper
    BoK Content Source: 
    MainTrain 2018
    Original date: 
    Tuesday, April 3, 2018
    “Sustainability through reliability” — presented at the 2015 MainTrain Conference — focused on the rapid growth of passenger flow at Toronto Pearson Airport and how, due to this growth, we were experiencing a high number of plumbing drainage failures. We carried out an RCA on our system and came up with changes in how we would prevent drainage failures. The changes we made dealt with our plumbing design standards; food and beverage tenant fats; oil and organics recovery system; lease agreements; and maintenance practices. However, that was only the starting point. In this presentation, we’ll discuss RCA conducted, the failures experienced, and the enhancements and improvements we made to make our system more reliable.
  • Enabling Excellence in Asset Management

    BoK Content Type: 
    Presentation Slides
    Presentation Paper
    BoK Content Source: 
    MainTrain 2018
    Original date: 
    Friday, March 30, 2018
    In this workshop, you’ll learn to foster an asset management culture within your organization with a focus on methods to form alignment, engagement, and internal championing. Based on the speaker’s experience and lessons learned in establishing and updating a program for large government organizations with diverse and complex portfolios, he’ll present his approach for the City of Mississauga. He’ll provide an overview on how to keep the program organized with large amounts of data and information, while staying committed to a fundamental view of purpose.
  • Increasing Operational Service Levels Using Preventative Maintenance Optimization Strategies: A Case Study of the LINK APM System at Toronto Pearson International Airport

    BoK Content Type: 
    Presentation Slides
    Presentation Paper
    BoK Content Source: 
    MainTrain 2018
    Original date: 
    Thursday, March 29, 2018
    In 2017, the LINK Automated People Mover (APM) at Toronto Pearson International Airport transported an average of 24,000 passengers per day — a 20% increase in passenger traffic from 2015, according to a 2017 report by the GTAA. To increase operational service levels, preventative maintenance optimization (PMO) initiatives were undertaken in 2015 and 2016 in co-ordination with the APM owner, manufacturer, and O&M service provider. The initiatives were designed to increase the overall day-to-day operational run-time of the LINK system while maintaining existing levels of safety and reliability. In this workshop, we’ll use the LINK APM system as a case study to discuss the requirements for successful PMO implementation, which include interorganizational communication and co-operation, RCM strategies, and due diligence as it relates to safety-related subsystems and processes. We’ll also offer a blueprint for similar optimization strategies.