City Scape

6.2 Work Planning

  • Managing Shutdowns, Turnarounds & Outages

    BoK Content Type: 
    Recommended Resources
    BoK Content Source: 
    Practitioner Produced
    Original date: 
    Saturday, December 16, 2017
    From the book cover. A carefully planned shutdown will improve your plant's safety and efficiency, while one that "just happens" can be disastrous. Developed from the author's highly successful seminars, this book takes you step by step through successfully managing production shutdowns. Identify what must be done, schedule equipment and staff, use project-management software, and save both dollars and downtime.  Reference Book for Module 6 of the MMP Program 
  • Debunking Risk Resiliency by Implementing a Risk-Based Maintenance Strategy

    BoK Content Type: 
    Presentation Slides
    Presentation Paper
    BoK Content Source: 
    MainTrain 2017
    Original date: 
    Tuesday, April 18, 2017
    Due largely to the release of ISO55000x:2014 family of standards, Asset Management is gaining worldwide acceptance as a valid business practice for asset-intensive organizations. The challenge that organizations now face is how to operationalize the principles and move it from “being understood in theory” to being “the way that we work”, to truly distill effective asset management practices and principles to the nooks and crannies of the organization. One key tenet of ISO55000x is the management of asset risk at all levels of asset interaction. On the other side, one area that has been struggling to understand asset management beyond maintenance management is the traditional Maintenance Department. This paper will capture the steps that Veolia North America is taking one of its Municipal Clients through to understand risk at the more granular levels and build risk resilience into its maintenance strategy.Yet for the average Maintenance Manager, the challenge of interpreting asset risk for the organization is still uncharted waters. There are several ways in which the traditional Maintenance Manager can understand the wide breadth of risks facing the asset, determine appropriate responses and communicate them to the appropriate stakeholders. In fact, one or more of these may already be in place in the organization but may not be seen as building risk resilience. This presentation will explore one methodology used by Veolia to develop an asset-centric, risk-based Maintenance Strategy at the City of Winnipeg’s, Waste Water Treatment Plants using a Maintenance Management Maturity Assessment.The City of Winnipeg’s Waste Water Department is at a very interesting juncture in its history, in that there are several major capital upgrades being undertaken, whilst the plants continue to run. The goal of the Maintenance Strategy is therefore two-fold. To maintain the existing levels of service at least whole life cost with risk balanced against the cost of meeting objectives, whilst ensuring that there is a plan to maximise maintenance for the future asset base to realise the benefit of the investment over the whole life of the assets. As a result, in 2016, in collaboration with its selected O&M improvement partner, Veolia North America, the City of Winnipeg’s Waste Water Treatment Plants, went on a path of discovery. Two significant tools of investigation were employed: 1. An Asset Management Maturity Assessment was conducted and 2. The City participated in the National Waste Water Benchmarking Initiative (NWWBI) Maintenance Task Force Survey implemented by AECOM. The Asset Management Maturity Assessment examined 8 fundamental areas of Maintenance Management and outlined positions of excellence that the City hoped to achieve both at the 1-year and 3-year mark from the date of assessment with 2017 being Year 1. The NWWBI Maintenance Task Force Survey examined 42 granular yet, over-lapping areas of Maintenance Management, with 18 of them reporting significant gaps for the City’s Waste Water Treatment Plants. The results of the two analyses were combined into eight (8) key Objectives and the underlying activities required to achieving them over the next three (3) years. These eight (8) Objectives are: 1. Implementation of Asset Condition Assessment Plan (ACAP) 2. Inventory Management Optimization Plan (IMOP) 3. Work Organization Improvement Plan (WOIP) 4. Implementation of Maintenance Quality Strategy (MQS) 5. Financial Capability Improvement Plan (FCIP) 6. Asset Registry Improvement Plan (ARIP) 7. Implementation of Document Management (DM) 8. Revision and Implementation of Asset Criticality Model (ACM)This presentation will examine the detailed plans for each objective, the inter-connectivity and alignment of the Objectives, the Road Map for the next 3 years, the processes for monitoring and continual improvement and the benefits of implementing this approach. Presented at MainTrain 2017 
  • Organizational Alignment

    BoK Content Type: 
    Presentation Slides
    Presentation Paper
    BoK Content Source: 
    MainTrain 2017
    Original date: 
    Thursday, April 6, 2017
    Effective maintenance plays a crucial role in today’s business. In order to manage costs, organizations attempt to get the most from their people and assets. Effective alignment between departments can dramatically improve asset reliability, reduce operation and maintenance costs and improve the effectiveness of the workforce.This presentation is intended to provide participants with the information and awareness they need to manage assets effectively. The need of cooperation between the operations and maintenance departments, as well as other departments such as supply chain will be discussed. Employees require more than high level principles; they must understand their role and how effective cooperation at all levels will provide value to the on-going operations, thereby allowing the business to remain profitable. Further, the presentation will examine the concept of Operational Excellence as the beginning of a transformation to a planned culture throughout the entire organization. Key to this topic is confirming who is in charge. Is the asset dictating how things should be done or are the people running it in charge?Asset management professionals often find themselves challenged by competing priorities in an effort to keep the system running. This session follows how maintenance tasks are initiated with work prioritization being a key element. Various roles will be discussed as well as the importance of scheduling and getting everyone on board with the schedule. Potential subtopics tailored to time restrictions: (1) Why do planned maintenance? (2) Cost of a break-in event, (3) Risk-based work selection, (4) Screening and approval of work, (5) Operators role in maintenance, (6) Operations, maintenance and supply chain departments’ role in scheduling, (7) Operations and maintenance coordination and roles, and (8) Managing the daily work list.  Presented at MainTrain 2017 
  • Rethinking Your Planning Scheduling Process

    BoK Content Type: 
    Presentation Slides
    Presentation Paper
    BoK Content Source: 
    MainTrain 2014
    Original date: 
    Thursday, November 20, 2014
    This half day workshop will cover the basics of planning and scheduling but with a down to earth approach: Why some organizations fail when they deploy planning and scheduling processes and others have tremendous success? Why do a majority of planners complain they don’t have enough time to plan? We will explain what you typically need to demonstrate in order to sell the benefits of planning and scheduling to your senior management. Examine the various steps of the planning process (work Identification, planning, scheduling, work execution, close out and review) with examples coming from organizations that do perform in planning and scheduling during this workshop. As well we look at the roles and responsibilities of the maintenance planner and what are the realistic expectations for this position.